GMW 8287 PDF

Find the most up-to-date version of GMW-R – GMW at Engineering GMW GMW GMW Additional References. EIA/JEDEC JESDAB. © Copyright General Motors Corporation All Rights. It is suggested to be at least 10 minutes in both IPC A and GMW For screening purposes (HASS, ESS), also depend on the stress limits being.

Author: Daijin Bazuru
Country: Bahrain
Language: English (Spanish)
Genre: Health and Food
Published (Last): 16 March 2006
Pages: 335
PDF File Size: 5.40 Mb
ePub File Size: 11.51 Mb
ISBN: 239-3-13168-599-3
Downloads: 35076
Price: Free* [*Free Regsitration Required]
Uploader: Kami

The duration and focus of this transition can be dictated by the rate of production increase, or by the rate of problem resolution. Thermal mass of components will direct the engineering judgment of using a minimum or maximum dwell period.

Random Vibration (RS)

The thermocouple wires should be attached to the circuit board with Kaptan adhesive tape and the thermocouple should be glued to the chip with Gw thermally conductive adhesive. Statistical methods will be employed, along with empirical experience, to arrive at good starting points for the three major parameters of our screen.

The fixture should be lightweight, GMW low in thermal mass, and ruggedly designed to sustain repetitive applications of the stress screen. The facility shall have failure analysis capability, or may utilize an external or independent facility to perform this responsibility. To use this website, you must agree to our Privacy Policyincluding cookie policy.

Reactions to out-of-control plot points should be swift with all resources energized. The GlidePath occurs between pilot and full rate production, and is paced to account for the increase in production rate and the rate of problem resolution.

Thus the total dwell at each level of vibration is dictated by the length of time it takes to run one cycle of functional testing on the sample. The entire process from identification of weaknesses to corrective action should be clearly tied into the problem reporting and gme process. All screen parameters are quantified gme the screen mutually agreed upon. Document the location of this thermocouple to minimize variation when future testing is conducted.

  INTERLEUCINAS PROINFLAMATORIAS Y ANTIINFLAMATORIAS PDF

Other disciplines to include are reliability engineering, manufacturing engineering, and the personnel who run the HALT system, if they are not part of the aforementioned groups. This standard applies to a diversified mix of product segments, including electronic assemblies, electro-mechanical assemblies, and may be applicable to certain mechanical assemblies as well. 82877 information is used to assist in product redesign decisions.

This small-scaled, high stress, test in designed to weed out problems that would eventually become a warranty concern or a detriment to long-term customer enthusiasm. gmq

Durability Growth through HALT/HASS and Accelerated Testing

For design improvement purposes HALTa longer dwell time can be appropriate for more defects to be precipitated and corrected for gnw robustness of the product. The test should never allow for the phase change of materials. Based on this assessment a decision is made to implement the redesign changes or to leave the product unmodified. Reduce step size as failure point is reached is appropriate, which allows a fine definition without compromising test duration. These individuals need not be present during the entire HALT, but must be available on an as needed basis.

This HALT process is performed following the corrective action process when a product is redesigned. The reason constant monitoring is essential is gma potential for unveiling a product problem is constantly changing during the screen.

An example of this type of product is available from the ” company” Has there been significant degradation? The monitoring process should facilitate root cause analysis.

  BIOLOGIA 444 ORYGINALNE ZADANIA MATURALNE PDF

highly accelerated life test_百度文库

The test facility shall maintain records of test events for products tested. The fixture must also efficiently transmit vibration energy to each product contained within the fixture. Document the location of this accelerometer to minimize variation when future? These devices are typically attached to? The accelerometers should be small enough to be mounted in the desired location, and light enough that their mass does not significantly impact or alter the vibration dynamic characteristics of the sample tested.

Specific thermal and vibration data measurements supported by tables, graphs, photographs as appropriate? This acronym has also become the service mark of the Qualmark Corporation to denote their version of this type of test chamber.

The screen is acceptable when no problems develop after 15 iterations of the screen. The values shown are from our worked example in the previous section.

Grms p3 0 5 Grms 2 0 Chamber technology for HALT is a repetitive shock vibration that functions with 6 degrees of freedom 3 linear and 3 rotational. The worst-case direction will be used to calibrate the input vibration level. The verification type HALT can be used as a Process Validation step to insure that design margins demonstrated during development are maintained with full production processes in effect.

These meetings shall occur prior to and subsequent to the product HALT. An innovative tool for the review of health and safety work practices and the implementation of effective controls of particulate exposures.